PROJECT RATIONALE
The issue was addressed in the Aimag governor’s action plan 2016-2020 Together-We, and the Development General Plan of Dalanzadgad soum - 2030 and policy document on the blood prevention of residents. In the past few years, central roads in Dalanzadgad soum have been built without any flood drainage system, so when it rains, roads are directly flooded and there is a great risk to life, health and property of individuals and organizations.
PROJECT OBJECTIVE
The project will build 6.5 km long road surface water drainage line in central roads of Dalanzadgad soum.
PROJECT OUTCOME