SCHOOL DORM BUILDING ENGINEERING DRAWING

SCHOOL DORM BUILDING ENGINEERING DRAWING

PROJECT RATIONALE

Since the commissioning the secondary school dormitory of Bayan-Ovoo soum has never been maintained. The dorm is not equipped with the ventilation system, the roof leaks during the rains, windows are cracked and the electrical cables donot comply safety standards and unsafe for the students. According to statistics, population of Mongolia is rapidly increasing since 2010 and the local population shall increase gradually. 20-25 students enroll to Bayan-Ovoo soum school every year in the recent yearsIn the next 5 years, the enrollment is expected to increase; the school enrollment will increase by 40 students in 2017, 35 students in 2018, 46 students in 2019, 40 students in 2020, 34 students in 2021. Within 5 years, 60% of students to enrollto  the school will be from herder families and we need to develop the engineering design for our school dorm to meet the Mongolian standards for school dormitories.

 


PROJECT OBJECTIVE

  • The dorm environment shall improve with the additional new dorm building engineering design.
  • Once the drawings will be ready the contractor shall address the investors and build the dormitory with the state funds.

 


PROJECT OUTCOME

  • Will have an approved engineering design for 120 students school dorm building Bayan-Ovoo soum school students shall be provided with a safe and pleasant school environment once the new dormitory shall be constructed
  •  Herders families shall be confident to send their children to the school